OP TAK Biomethane Injection Grant
By Business and Innovation Agency (API)
Check your eligibility
Sign up and we'll tell you whether your startup qualifies for this grant.
Quick Answer
Czech OP TAK grant of CZK 1–100 million (about ₹42 lakh–42 crore) for biogas-to-biomethane plants. Czech company required; rolling until 9 November 2027.
- Funding amount
- Varies
- Funding type
- Grant
- Application deadline
- 353d — 9 Nov 2027
- Location
- International
About this grant
Needs a company registered in Czechia before you apply: the call text says the applicant is a natural or legal person doing business "která má přidělené české IČ" (that has been assigned a Czech ID number) and is authorised to do business, and that it has been registered as an income tax payer in the Czech Republic continuously for at least two tax periods before applying. The plant must be in Czechia outside Prague, and a final building permit (or equivalent) and, for grid injection, a signed connection contract must already exist when you apply. An Indian company cannot apply directly; it would need a Czech company that meets these conditions.
Obnovitelné zdroje energie – vtláčení biometanu – výzva II (Renewable Energy – Biomethane Injection, Call II) is a Czech government investment grant for turning biogas into biomethane. It runs under the Operational Programme Technologies and Applications for Competitiveness (OP TAK), managed by the Ministry of Industry and Trade, with the Business and Innovation Agency (API) receiving applications. The grant runs from CZK 1 million to CZK 100 million per project (about ₹42 lakh to about ₹42 crore). Applications are accepted on a rolling basis from 9 November 2026 at 10:00 until 9 November 2027 at 10:00 Prague time, unless intake closes earlier as described below.
What the program offers
Support is a grant (the call says it is given "formou dotace"). The share of eligible costs it covers depends on company size and on the type of cost. For costs directly linked to producing biomethane, it is 65% for a small enterprise, 55% for a medium one and 45% for a large one. For other eligible costs, it is 50%, 40% and 30%. The company pays the rest.
Eligible costs are long-term tangible assets, intangible assets needed to run them, engineering work and project documentation. Project documentation and preparatory costs incurred before the application, after 1 January 2021, can be supported under the EU de minimis rules. The grant is paid back after the project or each project stage, so the company must pre-finance everything, including VAT. Across all OP TAK biomethane calls, one undertaking can receive at most EUR 30 million.
The call has CZK 1 billion in total: CZK 400 million for less developed regions and CZK 600 million for transition regions, with a separate ranking for each.
Who can apply
Small, medium-sized and large enterprises can apply. The applicant must hold a Czech ID number, be authorised to do business, have two tax periods as a Czech income tax payer, and not be in liquidation. Its beneficial owner must not be a citizen or resident of a jurisdiction on the EU list of non-cooperative tax jurisdictions. Projects of CZK 5 million or more in eligible costs need at least 5 points in the simplified economic evaluation of financial health.
Supported projects are technology to upgrade biogas to biomethane and inject it into the gas grid, or to upgrade it and fill it (for example Bio-CNG filling equipment and stations). Research, development and pilot projects are not supported.
For an Indian founder this suits a company that already runs, or is buying into, a biogas plant in Czechia through a Czech entity with tax history. It is not for early-stage technology developers.
How to apply
Applications go through the IS KP21+ portal. You need the last two years of financial statements, the economic evaluation form for projects of CZK 5 million or more, a business plan following the call outline, the specific conditions annex, the do-no-significant-harm and climate assessment, the final permit document covering every planned measure, and, for grid injection, a valid connection contract. Permits and the connection contract cannot be added later as corrections.
How applications are judged and what happens next
Evaluation is single-round, with separate rankings for each region category. A recommended applicant has at most 30 days to submit the documents needed for the grant decision, such as a company size declaration and proof of rights to the land. The biomethane plant must deliver at least 62.5% of its licensed maximum output each year, and eligible costs may not exceed CZK 760,000 per Nm3 of biomethane per hour.
About the Business and Innovation Agency (API)
API is the Czech state agency that receives and administers OP TAK grant applications for the Ministry of Industry and Trade, and publishes the call documents and guidance.
Things to check before you apply
The ministry may close intake for a region category once applications reach 200% of its allocation, but not before 26 November 2026. Physical work must finish by 30 June 2029, and extensions past that date will be very limited. Work must not start before the application is registered.
Eligibility
See if you're eligible
Full eligibility criteria — entity type, stage, sector, founder profile and registration requirements — plus your fit for this program. Sign up to view.
Grant providers
Benefits & Funding
- Fund type
- Grant
- Equity
- Equity-free
- Repayment
- Non-repayable
What You Get
A non-repayable grant of CZK 1 million to CZK 100 million (about ₹42 lakh to about ₹42 crore) per project, capped at EUR 30 million per undertaking across OP TAK biomethane calls. It covers 65%/55%/45% of costs directly linked to biomethane production and 50%/40%/30% of other eligible costs for small, medium and large enterprises. Eligible costs are tangible and intangible assets, engineering work and project documentation. The grant is reimbursed after the project or each stage.
- Disbursement
- Reimbursement
- Bootstrap friendly
- Yes
Timelines & Process
Selection Process
Applications are checked for formal requirements and eligibility and then assessed in a single round against the call's evaluation model, with a separate ranking for less developed and transition regions. Projects of CZK 5 million or more need at least 5 points in the simplified economic evaluation.
Application Process
- 1
Secure permits
Obtain the final permit and, for grid injection, the connection contract.
You - 2
- 3
- 4
- 5
How to apply
Four steps from draft to disbursement — one action each.
- 1
Draft your application
Answer the form inside the grant tracker — AI drafts each response using your past answers, so you're not starting from a blank page.
- 2
Submit on the official portal
Use the official application link and verify all details before final submission.
- 3
Follow up
Reach out 5–7 days after submitting to confirm receipt and ask about the review timeline.
Frequently Asked Questions
Can an Indian startup apply for the Czech biomethane injection grant?
Only through a company registered in Czechia. The applicant must have a Czech ID number, be authorised to do business and have been a Czech income tax payer for at least two tax periods. The plant must be in Czechia outside Prague.
How much is the OP TAK biomethane grant?
Between CZK 1 million and CZK 100 million per project, about ₹42 lakh to about ₹42 crore. One undertaking can receive at most EUR 30 million across all OP TAK biomethane calls.
What share of costs does the grant cover?
For costs directly linked to biomethane production, 65% for small, 55% for medium and 45% for large enterprises. For other eligible costs, 50%, 40% and 30%. The company funds the remainder.
Is it a grant or a loan?
It is a grant: the call says support is given in the form of a subsidy (dotace). It is not repaid if the conditions of the grant decision are met.
How is the money paid?
The grant is reimbursed after the project or each project stage, once the conditions are met. The company must finance the investment first, including VAT.
What is the deadline for biomethane call II?
Intake runs from 9 November 2026 at 10:00 to 9 November 2027 at 10:00 Prague time. The ministry may close a region category early once applications reach 200% of its allocation, but not before 26 November 2026.
What projects are supported?
Technology to upgrade biogas to biomethane and inject it into the gas grid, or to upgrade it and fill it, such as Bio-CNG filling stations. Research, development and pilot projects are not supported.
What documents are needed to apply?
Two years of financial statements, an economic evaluation form for projects of CZK 5 million or more, a business plan, the specific conditions annex, the environmental assessment, a final permit document and, for grid injection, a connection contract with the grid operator.
Are there output conditions after the grant?
Yes. The plant must deliver at least 62.5% of its licensed maximum output each year, and eligible costs may not exceed CZK 760,000 per Nm3 of biomethane per hour.
Sources
Data on this page is compiled from official program and provider references.