Production Linked Incentive (PLI) Scheme for High Efficiency Solar PV Modules
Ministry of New and Renewable Energy (MNRE) द्वारा
अपनी पात्रता जांचें
साइन अप करें और हम आपको बताएंगे कि आपका स्टार्टअप इस ग्रांट के लिए योग्य है या नहीं।
त्वरित उत्तर
MNRE's PLI scheme pays solar module makers, selected by competitive bidding, an incentive on sales of high-efficiency solar PV modules for 5 years after commissioning. Both tranches have been awarded.
- फंडिंग राशि
- अलग-अलग
- फंडिंग प्रकार
- सब्सिडी
- आवेदन की अंतिम तिथि
- —
- स्थान
- भारत में पंजीकृत स्टार्टअप्स के लिए खुला
Results & next round
Applications for this round are closed. The organiser has not published a selection list that we can verify yet.
Selections for this programme are announced by Ministry of New and Renewable Energy (MNRE). Official links are listed under Sources below.
We update this page when results are published, and when the next round opens.
इस सब्सिडी के बारे में
The Production Linked Incentive (PLI) Scheme "National Programme on High Efficiency Solar PV Modules" is run by the Ministry of New and Renewable Energy (MNRE) to build integrated solar PV module manufacturing in India. The two tranches together have an outlay of Rs. 24,000 crore.
Status: both tranches awarded Tranche I (outlay Rs. 4,500 crore): IREDA issued letters of award in November and December 2021 to three bidders for 8,737 MW of fully integrated module manufacturing. Tranche II (outlay Rs. 19,500 crore): SECI issued letters of award in April 2023 to 11 bidders for 39,600 MW of fully or partially integrated module manufacturing. No further tranche has been announced.
How the incentive works Manufacturers were selected through a transparent competitive bidding process, not an open application form. A selected manufacturer gets the PLI on an annual basis on the manufacture and sale of high-efficiency solar PV modules for 5 years from the actual date of commissioning or the scheduled commissioning date, whichever is earlier.
Who it is for Large solar PV manufacturers setting up integrated module, cell, wafer or polysilicon capacity in India. Watch the MNRE PLI page for any new tranche.
पात्रता
देखें कि आप पात्र हैं या नहीं
पूरी पात्रता शर्तें — संस्था प्रकार, स्टेज, क्षेत्र, फाउंडर प्रोफ़ाइल और पंजीकरण आवश्यकताएं — साथ ही इस प्रोग्राम के लिए आपकी फ़िट। देखने के लिए साइन अप करें।
सब्सिडी प्रदाता
The Ministry of New and Renewable Energy (MNRE) is the Government of India ministry responsible for solar, wind, green hydrogen and other renewable energy. It is not an incubator or a standing startup fund. Most of what it runs is aimed at households, utilities and large…
Learn moreआवेदन कैसे करें
ड्राफ़्ट से वितरण तक चार चरण — हर चरण में एक कार्रवाई।
- 1
आधिकारिक पोर्टल पर जमा करें
आधिकारिक आवेदन लिंक का उपयोग करें और अंतिम रूप से जमा करने से पहले सभी विवरण सत्यापित करें।
- 2
फ़ॉलो अप करें
जमा करने के 5–7 दिन बाद प्राप्ति की पुष्टि और समीक्षा समयरेखा के बारे में पूछने के लिए संपर्क करें।
स्रोत
इस पेज की जानकारी आधिकारिक प्रोग्राम और प्रदाता स्रोतों से ली गई है।







