Tripura Power Charges Reimbursement
By Department of Industries and Commerce, Government of Tripura
Check your eligibility
Sign up and we'll tell you whether your startup qualifies for this grant.
Quick Answer
Tripura supports industrial power bills at Rs.5.00 per unit with no ceiling above 20 HP, or 25% reimbursement up to Rs.15 / Rs.25 lakhs a year up to 20 HP.
About this subsidy
Under the Tripura Industrial Investment Promotion Incentives Scheme, 2022, industrial units in Tripura can claim support on power charges. This record is that power-charges incentive (section 4). The rate depends on connected load — above 20 HP versus up to 20 HP — and, for the smaller-load band, on whether the enterprise is Non-Thrust or Thrust Sector.
For industrial units with connected load above 20 HP, power charges will be provided at Rs.5.00 per unit without any upper ceiling. That Rs.5.00 per unit figure is a rate per unit of electricity. It is not a lump-sum award and is not treated here as a total rupee grant. There is no rupee cap stated for this above-20 HP band.
For industrial units with connected load up to 20 HP, the State reimburses 25% of the power charges actually paid, subject to an upper ceiling of Rs.15 lakhs for a Non-Thrust Sector enterprise and Rs.25 lakhs for a Thrust Sector enterprise, per annum. In that band you pay the bill first and claim a quarter of it back, cut off at those yearly ceilings.
The claimant is the industrial unit in Tripura, not a housing colony or a commercial shop that happens to share a feeder. Keep connected-load documents from the licensee, monthly electricity bills, and payment proof. Thrust versus Non-Thrust only changes the Rs.15 lakhs / Rs.25 lakhs ceiling in the up-to-20 HP band; the above-20 HP band is Rs.5.00 per unit with no upper ceiling in the clause.
Apply through SWAAGAT and the District Industries Centre. TIIPIS 2022 is rolling; this clause has no deadline. The Department of Industries and Commerce, Government of Tripura checks load, bills, and sector band before release. This is a subsidy, not equity and not a loan. Because the headline rate is per unit, this record does not set a total award floor or ceiling in rupees.
Eligibility
See if you're eligible
Full eligibility criteria — entity type, stage, sector, founder profile and registration requirements — plus your fit for this program. Sign up to view.
Subsidy providers
Benefits & Funding
What You Get
Support is on the power bill, not a lump grant. Connected load above 20 HP: power charges provided at Rs.5.00 per unit with no upper ceiling. Connected load up to 20 HP: 25% of power charges actually paid, upper ceiling Rs.15 lakhs (Non-Thrust) or Rs.25 lakhs (Thrust) per enterprise per annum. The Rs.5.00 per unit rate is not a total award. The Rs.15 lakhs and Rs.25 lakhs figures are yearly ceilings only for the up-to-20 HP reimbursement band. Nothing in the clause takes equity or asks the subsidy back if the unit remains eligible.
- Disbursement
- Reimbursement
- Bootstrap friendly
- Yes
Timelines & Process
Applications
Rolling basis
Selection Process
The District Industries Centre and the Department of Industries and Commerce check that the claimant is an industrial unit in Tripura, read connected load against the 20 HP threshold, and match bills to the correct formula. Above 20 HP they apply Rs.5.00 per unit with no upper ceiling. Up to 20 HP they apply 25% of power charges actually paid and cut off at Rs.15 lakhs or Rs.25 lakhs per annum by sector. There is no pitch round. Claims without load proof or unpaid-bill gaps in the 25% band are queried or refused.
Application Process
- 1
Keep load and bill proof
Hold licensee connected-load documents and electricity bills (and payment proof for the up-to-20 HP reimbursement band).
You - 2
- 3
- 4
How to apply
Four steps from draft to disbursement — one action each.
- 1
See the questions before you start
Download every question this programme's application form asks, so you can prepare your answers offline before opening the portal.
- 2
Line up your documents
Keep every document from the checklist ready in one folder. Missing docs are the #1 reason applications get bounced.
- 3
Submit on the official portal
Use the official application link and verify all details before final submission.
- 4
Follow up
Reach out 5–7 days after submitting to confirm receipt and ask about the review timeline.
Frequently Asked Questions
What do units above 20 HP connected load receive?
Power charges will be provided at Rs.5.00 per unit without any upper ceiling. That is a per-unit rate, not a fixed rupee grant for the year.
What do units up to 20 HP receive?
They are reimbursed 25% of the power charges actually paid, subject to Rs.15 lakhs per annum (Non-Thrust Sector) or Rs.25 lakhs per annum (Thrust Sector).
Is there a total rupee award I can budget as a grant?
The clause does not state a lump-sum award. Above 20 HP the figure is Rs.5.00 per unit with no ceiling. Up to 20 HP the ceilings are Rs.15 lakhs or Rs.25 lakhs a year on a 25% reimbursement of bills paid.
Who can claim?
Industrial units in Tripura. The split is by connected load (above or up to 20 HP) and, for the smaller-load band, by Non-Thrust versus Thrust Sector.
Do I need to pay the electricity bill first?
For the up-to-20 HP band, yes — reimbursement is 25% of power charges actually paid. For the above-20 HP band the clause provides power charges at Rs.5.00 per unit; keep licensee bills and load papers either way.
Where do I apply?
Through SWAAGAT (https://swaagat.tripura.gov.in/) and the District Industries Centre, Department of Industries and Commerce, Government of Tripura. TIIPIS 2022 is rolling; this clause has no deadline.
Is this MSME-only?
The clause names industrial units and connected load. It does not restrict the benefit to MSMEs only.
Sources
Data on this page is compiled from official program and provider references.








